No failure patterns match your search.
Environment: INT
Failure patterns: 4 · Failures matched: 28 · Total runs: 4 · Runs affected: 3
| Failure patternThe canonical description of a recurring CI failure, extracted and normalized from raw logs. | Failed atThe stage of the job run where this failure occurred: 'provision' (environment setup, DEV only), 'e2e' (test suite execution), or 'other' (CI infrastructure issues that did not produce a failure pattern). | Number of distinct job runs where this failure pattern was detected. | Percentage of all job runs in this environment affected by this failure pattern during the selected window. | Classification of this failure pattern: Regression (likely caused by a specific PR), Flake (intermittent failure spread across days), Noise (low-quality or generic pattern), or Indeterminate. | TrendShows daily activity for this failure pattern in a trailing window anchored to the selected end date. The sparkline covers at least 7 days and at most 14 days, depending on the current window size. | Also inOther environments where the same failure pattern was also detected during the selected window. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
timeout during CreateHCPClusterAndWait; context deadline exceededfull failure pattern: timeout during CreateHCPClusterAndWait; context deadline exceeded Signal: IndeterminateSignal: Indeterminate — seen in 4 prior week(s); active 1 day(s) | e2e | 3 | 75.00%3 of 4 job runs affected | IndeterminateSignal: Indeterminate — seen in 4 prior week(s); active 1 day(s) | Show trend detailsMay 6: 0 · May 7: 0 · May 8: 0 · May 9: 0 · May 10: 0 · May 11: 0 · May 12: 15 | none | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Full failure examples (3)fail [github.com/Azure/ARO-HCP/test/e2e/nodepool_version_upgrade.go:130]: Unexpected error:
<*fmt.wrapErrors | 0xc001090f30>:
failed to create HCP cluster np-version-upgrade-cluster-fg49xt, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster np-version-upgrade-cluster-fg49xt in resource group rg-np-version-upgrade-fg49xt-8vh52m, error: failed waiting for cluster="np-version-upgrade-cluster-fg49xt" in resourcegroup="rg-np-version-upgrade-fg49xt-8vh52m" to finish creating, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster np-version-upgrade-cluster-fg49xt in resource group rg-np-version-upgrade-fg49xt-8vh52m, error: context deadline exceeded
...
occurred
fail [github.com/Azure/ARO-HCP/test/e2e/nodepool_version_upgrade.go:130]: Unexpected error:
<*fmt.wrapErrors | 0xc001090f30>:
failed to create HCP cluster np-version-upgrade-cluster-fg49xt, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster np-version-upgrade-cluster-fg49xt in resource group rg-np-version-upgrade-fg49xt-8vh52m, error: failed waiting for cluster="np-version-upgrade-cluster-fg49xt" in resourcegroup="rg-np-version-upgrade-fg49xt-8vh52m" to finish creating, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster np-version-upgrade-cluster-fg49xt in resource group rg-np-version-upgrade-fg49xt-8vh52m, error: context deadline exceeded
...
occurredfail [github.com/Azure/ARO-HCP/test/e2e/nodepool_version_upgrade.go:130]: Unexpected error:
<*fmt.wrapErrors | 0xc0013e0b10>:
failed to create HCP cluster np-version-upgrade-cluster-x9rbd6, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster np-version-upgrade-cluster-x9rbd6 in resource group rg-np-version-upgrade-x9rbd6-74ztbw, error: failed waiting for cluster="np-version-upgrade-cluster-x9rbd6" in resourcegroup="rg-np-version-upgrade-x9rbd6-74ztbw" to finish creating, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster np-version-upgrade-cluster-x9rbd6 in resource group rg-np-version-upgrade-x9rbd6-74ztbw, error: context deadline exceeded
...
occurred
fail [github.com/Azure/ARO-HCP/test/e2e/nodepool_version_upgrade.go:130]: Unexpected error:
<*fmt.wrapErrors | 0xc0013e0b10>:
failed to create HCP cluster np-version-upgrade-cluster-x9rbd6, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster np-version-upgrade-cluster-x9rbd6 in resource group rg-np-version-upgrade-x9rbd6-74ztbw, error: failed waiting for cluster="np-version-upgrade-cluster-x9rbd6" in resourcegroup="rg-np-version-upgrade-x9rbd6-74ztbw" to finish creating, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster np-version-upgrade-cluster-x9rbd6 in resource group rg-np-version-upgrade-x9rbd6-74ztbw, error: context deadline exceeded
...
occurredfail [github.com/Azure/ARO-HCP/test/e2e/image_registry_cluster_create.go:89]: Unexpected error:
<*fmt.wrapErrors | 0xc00108a570>:
failed to create HCP cluster disabled-image-registry-hcp-cluster, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster disabled-image-registry-hcp-cluster in resource group disabled-image-registry-dqgg7v, error: failed waiting for cluster="disabled-image-registry-hcp-cluster" in resourcegroup="disabled-image-registry-dqgg7v" to finish creating, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster disabled-image-registry-hcp-cluster in resource group disabled-image-registry-dqgg7v, error: context deadline exceeded
...
occurred
fail [github.com/Azure/ARO-HCP/test/e2e/image_registry_cluster_create.go:89]: Unexpected error:
<*fmt.wrapErrors | 0xc00108a570>:
failed to create HCP cluster disabled-image-registry-hcp-cluster, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster disabled-image-registry-hcp-cluster in resource group disabled-image-registry-dqgg7v, error: failed waiting for cluster="disabled-image-registry-hcp-cluster" in resourcegroup="disabled-image-registry-dqgg7v" to finish creating, caused by: timeout '45.000000' minutes exceeded during CreateHCPClusterFromParam for cluster disabled-image-registry-hcp-cluster in resource group disabled-image-registry-dqgg7v, error: context deadline exceeded
...
occurredContributing tests (12)
Affected runs (3)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
failed to cleanup resource group: at least one HCP cluster <cluster> to delete: failed waiting for hcpcluster="<cluster>" in resourcegroup="<resource-group>" to finish deleting: c...full failure pattern: failed to cleanup resource group: at least one HCP cluster <cluster> to delete: failed waiting for hcpcluster="<cluster>" in resourcegroup="<resource-group>" to finish deleting: context canceled Signal: IndeterminateSignal: Indeterminate — no prior history; active 2 day(s) — New failure pattern — no prior history | e2e | 3 | 75.00%3 of 4 job runs affected | IndeterminateSignal: Indeterminate — no prior history; active 2 day(s) — New failure pattern — no prior history | Show trend detailsMay 6: 0 · May 7: 0 · May 8: 0 · May 9: 0 · May 10: 0 · May 11: 1 · May 12: 10 | none | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Full failure examples (3)fail [github.com/Azure/ARO-HCP/test/util/framework/per_test_framework.go:249] A node timeout occurred and then the following failure was recorded in the timedout node before it exited:
Unexpected error:
<*errors.joinError | 0xc0016c63f0>:
failed to cleanup resource group: at least one hcp cluster failed to delete: failed waiting for hcpCluster="cluster-candidate-4-21-bnmd25" in resourcegroup="rg-candidate-4-21-j4jdzw" to finish deleting: context canceled
...
occurred
fail [:0]: A node timeout occurred
fail [github.com/Azure/ARO-HCP/test/util/framework/per_test_framework.go:249] A node timeout occurred and then the following failure was recorded in the timedout node before it exited:
Unexpected error:
<*errors.joinError | 0xc0016c63f0>:
failed to cleanup resource group: at least one hcp cluster failed to delete: failed waiting for hcpCluster="cluster-candidate-4-21-bnmd25" in resourcegroup="rg-candidate-4-21-j4jdzw" to finish deleting: context canceled
...
occurred
fail [:0]: A node timeout occurredfail [github.com/Azure/ARO-HCP/test/util/framework/per_test_framework.go:249] A node timeout occurred and then the following failure was recorded in the timedout node before it exited:
Unexpected error:
<*errors.joinError | 0xc001054348>:
failed to cleanup resource group: at least one hcp cluster failed to delete: failed waiting for hcpCluster="cluster-gpu-np" in resourcegroup="rg-gpu-nodepool-NC4asT4v3-k7q74m" to finish deleting: context canceled
...
occurred
fail [:0]: A node timeout occurred
fail [github.com/Azure/ARO-HCP/test/util/framework/per_test_framework.go:249] A node timeout occurred and then the following failure was recorded in the timedout node before it exited:
Unexpected error:
<*errors.joinError | 0xc001054348>:
failed to cleanup resource group: at least one hcp cluster failed to delete: failed waiting for hcpCluster="cluster-gpu-np" in resourcegroup="rg-gpu-nodepool-NC4asT4v3-k7q74m" to finish deleting: context canceled
...
occurred
fail [:0]: A node timeout occurredfail [github.com/Azure/ARO-HCP/test/util/framework/per_test_framework.go:249] A node timeout occurred and then the following failure was recorded in the timedout node before it exited:
Unexpected error:
<*errors.joinError | 0xc0018401c8>:
failed to cleanup resource group: at least one hcp cluster failed to delete: failed waiting for hcpCluster="np-version-upgrade-cluster-cdgrnk" in resourcegroup="rg-np-version-upgrade-cdgrnk-zbcvds" to finish deleting: context canceled
...
occurred
fail [:0]: A node timeout occurred
fail [github.com/Azure/ARO-HCP/test/util/framework/per_test_framework.go:249] A node timeout occurred and then the following failure was recorded in the timedout node before it exited:
Unexpected error:
<*errors.joinError | 0xc0018401c8>:
failed to cleanup resource group: at least one hcp cluster failed to delete: failed waiting for hcpCluster="np-version-upgrade-cluster-cdgrnk" in resourcegroup="rg-np-version-upgrade-cdgrnk-zbcvds" to finish deleting: context canceled
...
occurred
fail [:0]: A node timeout occurredContributing tests (8)
Affected runs (3)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DeleteResourceGroup timed out after <minutes> minutes; context deadline exceededfull failure pattern: DeleteResourceGroup timed out after <minutes> minutes; context deadline exceeded Signal: IndeterminateSignal: Indeterminate — no prior history; active 1 day(s) — New failure pattern — no prior history | e2e | 2 | 50.00%2 of 4 job runs affected | IndeterminateSignal: Indeterminate — no prior history; active 1 day(s) — New failure pattern — no prior history | Show trend detailsMay 6: 0 · May 7: 0 · May 8: 0 · May 9: 0 · May 10: 0 · May 11: 0 · May 12: 2 | none | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Full failure examples (2)fail [github.com/Azure/ARO-HCP/test/e2e/cluster_delete_cx_rg.go:143]: Unexpected error:
<*fmt.wrapErrors | 0xc000d58210>:
failed to delete resource group, caused by: timeout '60.000000' minutes exceeded during DeleteResourceGroup for resource group cx-rg-cluster-bpc899, error: context deadline exceeded
...
occurred
fail [github.com/Azure/ARO-HCP/test/e2e/cluster_delete_cx_rg.go:143]: Unexpected error:
<*fmt.wrapErrors | 0xc000d58210>:
failed to delete resource group, caused by: timeout '60.000000' minutes exceeded during DeleteResourceGroup for resource group cx-rg-cluster-bpc899, error: context deadline exceeded
...
occurredfail [github.com/Azure/ARO-HCP/test/e2e/cluster_delete_cx_rg.go:143]: Unexpected error:
<*fmt.wrapErrors | 0xc0013a6240>:
failed to delete resource group, caused by: timeout '60.000000' minutes exceeded during DeleteResourceGroup for resource group cx-rg-cluster-ds2snt, error: context deadline exceeded
...
occurred
fail [github.com/Azure/ARO-HCP/test/e2e/cluster_delete_cx_rg.go:143]: Unexpected error:
<*fmt.wrapErrors | 0xc0013a6240>:
failed to delete resource group, caused by: timeout '60.000000' minutes exceeded during DeleteResourceGroup for resource group cx-rg-cluster-ds2snt, error: context deadline exceeded
...
occurredContributing tests (1)
Affected runs (2)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Unauthorizedfull failure pattern: Unauthorized Signal: IndeterminateSignal: Indeterminate — no prior history; active 1 day(s) — New failure pattern — no prior history | e2e | 1 | 25.00%1 of 4 job runs affected | IndeterminateSignal: Indeterminate — no prior history; active 1 day(s) — New failure pattern — no prior history | Show trend detailsMay 6: 0 · May 7: 0 · May 8: 0 · May 9: 0 · May 10: 0 · May 11: 0 · May 12: 1 | none | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Full failure examples (1)fail [github.com/Azure/ARO-HCP/test/e2e/external_auth_create.go:222]: Timed out after 300.000s.
Expected success, but got an error:
<*errors.StatusError | 0xc000deac80>:
Unauthorized
...
fail [github.com/Azure/ARO-HCP/test/e2e/external_auth_create.go:222]: Timed out after 300.000s.
Expected success, but got an error:
<*errors.StatusError | 0xc000deac80>:
Unauthorized
...Contributing tests (1)
Affected runs (1)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||